Gold Rat Metal Detectors is located 6/50 Freda Street Upper Mount Gravatt. Gold Rat Engineering is located 4/16 Redcliffe Gardens Drive Clontarf This is where you will see the largest range of your highbankers, sluices and accessories
This weekend is a long weekend here in QLD so both stores wikll be closed on Monday 7th October - all orders placed during this time will be processed when we return Tuesday.

Customer Reviews

Based on 2 reviews Write a review
Description

Introducing our 6 inch Modular Sluice extension option suited to our Gold Rat Cleanup sluice, and cleanup sluice highbanker conversion.

Made from CNC Milled 5052 Aluminium two part Extension with sleeved joiner and stainless steel fixtures, this option allows the prospector and miner alike to increase throughput, processing capacity and when overfeeding reduce losses.

The design incorporates a multi-mount connection system which integrates with every leg option we have offered over the years, as with all of our products the unit is forward and backward compatible.

When adding to a 6 inch recirculating system / cleanup system simply remove the lower legs and use the sleeve to extend while migrating the legs to a lower position, there are three positions in total available to you.

If using for a bushwalker river sluice you can simply drill 8mm holes to match the profile of the rear mounts.

One awesome feature of this extension is there is no limit to how many extensions you can run, each sluice is cnc milled to accommodate another extension.

Whats included:

1 x Sluice

1 x Sluice Connector Sleeve

1 x 6 inch Dream mat colour of your choice (unless naked is selected)

1 x 6 inch dream mat clamp

2 x m6x16 button head bolt

2 x m8 stainless wingnut

6 x m8x16 button head bolt

6 x m8 Stainless Flange nut